Sometimes demolition can be done very quickly, but not when you’re conserving things that are going to be put back together again. I spent some time last week watching the stones in this wall being carefully separated into piles and the dressed stone being neatened and cleaned before being stacked on pallets and taken away. The wall has had to come down to give better access to the site; it’ll be reinstated, eventually, a bit further back. Even though it’s a slow and deliberate process, things can move amazingly fast – I’m constantly surprised by how much has changed from one day to the next.

These drawings were from last week, when the weather was better; this week I’ve been dodging rain and haven’t managed to get too many good opportunities to draw. 

Cliffe Castle Park in Keighley is being restored with funds from the Heritage Lottery Fund. Work started on site in June and I’m following progress and sketching whenever I can.

More updates on the work, photos, plans, and background information at: https://m.facebook.com/Cliffe-Castle-Heritage-Lottery-Bid-304048249751094 and at the Cliffe Castle Park Conservation Group website.