​Cliffe Castle Park in Keighley is being restored with funds from the Heritage Lottery Fund. Work started on site back in June 2016 and I’m following progress and sketching whenever I can.

After a long pause at the site of the pond when nothing much seemed to be happening, in the last couple of weeks things have really started to move. 

I hadn’t sketched in this part of the park for a long time, but I didn’t realise just how long until I looked back and found that it was back in the summer of last year. Things have moved on quite a bit since then, but there have been delays – mostly because of the complicated infrastructure needed for the workings of the pond and the two fountains – and for a long time there hasn’t been anything much to record. 

But all that changed recently when mysterious box-like brick structures started to appear in the pond itself, and then a great deal of digging and landscaping began all around the perimeter. Pipes were laid in deep trenches that seemed to be going in all sorts of directions. Mounds of topsoil were built up around the site and rockwork began to be laid along the edge of the pond itself – these lines of rock will define the edges of the pond and the path that will go around it. And then a large green cupboard the size of a small shed was installed, evidently full of electrical connections – the control centre for all the filtration and supply for the pond and both the fountains. I haven’t had time to study all this groundwork and infrastructure enough to be able to describe it or explain it properly, but I did manage to catch some of the work as it developed – and things are moving along fast. 

Looking more carefully at all the sketches I’ve done of the pond, I wish I’d thought of doing some drawings at regular intervals from a fixed point. What I’ve got is hardly an accurate record of how the landscape has changed – I can’t even work out if I’ve got the trees in the right places, though the largest ones are roughly where they should be. A landscape architect would have drawn this in a much more faithful and recognisable way! It’s just another of those things that I’m learning as I go along. 

The next exciting thing will be the return of the fountains, fully restored and ready to go back on their bases and have the water supply connected; there’s still a lot to do, but things are shaping up! 

More updates on the work of the conservation project, photos, plans, and background information here, and at the Cliffe Castle Park Conservation Group website and on the Parks Service page of Bradford Leisure Services.