The pond is finished! The final stages of lining it included putting in water-bar, (or high-pressure gasket to give it its proper name) – along the two channels in the cement that had been left for the purpose. It’s clever stuff – it absorbs the expansion and contraction that happens with changing temperatures and thereby prevents cracking in the cement. Amazingly this narrow red tape can expand up to 200 times its size, which is why they took great care to make sure the surface where it was laid was completely dry, to stop it immediately puffing up to something the size of an anaconda……(!) 

Laying water-bar in the pond liner

All this was explained to me in patient detail by Bill the site foreman who has never minded me asking endless questions. He’s always been ready to stop and kindly educate me about things like the proportions of cement-mix, or the uses of threaded stainless steel bar. I’ve learned a lot from Bill, and not least by just watching him at work and directing the men he works with. 

Bill directing work from the edge of the fountain

After many years with Casey’s, Bill has now reached retirement and I was extremely honoured to be asked to make him a card that all his fellow workers could sign and present to him on his last day, at the end of August. Yesterday was the day – and like all endings and good-byes, a moment of a lot of feelings and emotions. When a team has worked together for a long time, breaking that apart is hard for everyone – especially those who have worked closely side-by-side, and when someone as well liked and well respected as Bill moves on, he leaves a gap that will not be filled. Lots of smiles and laughter, but in the days and weeks to come Bill will be missed. I will miss him too, along with all the rest. 

Detail from Bill's retirement card

Detail from Bill’s retirement card

And now the pond that Bill worked so hard to perfect is full of water, with not a sign of a leak; the fountain in the middle has been installed, and the bases of the two carved marble fountains have been lined and made water-tight, and on Wednesday, for the first time and after such a long time of waiting – and just in time for Bill’s last day – the water was turned on and the fountains came to life. I was so excited I think I actually jumped up and down – and even though the security fence is still up and poking a camera through the wire mesh is not an easy thing to do, I managed to take a wobbly video with my phone. 

(Sincere apologies if this video doesn’t work as it’s the first time I’ve ever posted one; I’m hoping that together the magic of the WordPress editor and my ability to understand it will carry the day……) 

Advertisements