Cliffe Castle Park in Keighley is being restored with funds from the Heritage Lottery Fund. Work started on site back in June 2016 and I’m following progress and sketching whenever I can.

It’s now more than a year since work started in the park and we’re past the deadline for completion, but with a project of this scale these things can happen.

This means that the Grand Opening Event on July 30th has had to be trimmed down accordingly and won’t be the full-blown celebration that was originally planned; instead it’ll be a day of music and other attractions, re-titled the Cliffe Castle Garden Party. But for me, the fact that work is still going on means there are still interesting stories unfolding and lots still to record. 

Lowering the carved dolphin support onto the fountain base

The restored marble fountains are being put back together, and I caught the act of lowering the carved dolphin support and fixing it into place on the north fountain. These structures are like tiered wedding cakes – two great dishes one on top of the other supported by carved middle sections, topped off by carved cherubs (which had been badly damaged – one was missing a head, and the other was riding a headless goose. Or swan? You can see the whole post I did on the unrestored fountains here.) 

Fountain before restoration

Fountain before restoration in 2016

It was exciting to see the cleaned up dolphins back, and interesting to watch as holes were drilled in the marble so the whole piece could be pinned in place on top of the first dish with stainless steel threaded rods. The blue pipes that supply water up to the top of the fountain had to be carefully threaded through each section…but before that could happen the crane had to carefully raise and lower the thing into place. Guiding it into position was a two man job and the best way to grasp hold of it was generally one hand firmly in a dolphin’s open mouth… 

Drilling holes and lowering the dolphins into placeThreading water pipes through dolphins Quite tricky, as the dolphins all have to end up facing in exactly the right direction. 

Then it was all about making sure everything was level and perfectly upright…. and in a day or so the next section will be going up. Before long now we’ll see the fountains looking as they once were – and I can’t wait to see water spouting and gushing and overflowing! 

In the meantime I hope I catch more of these moments as the restoration story continues. It’s easy to miss – and often things happen before I know it and take me by surprise. This was a lucky day. 




More updates on the work of the conservation project, photos, plans, and background information here, and at the Cliffe Castle Park Conservation Group website and on the Parks Service page of Bradford Leisure Services.